33 Years of HOT RUBBER roofing.

Solid Ground Contracting has been installing fully reinforced, 2-ply hot rubber membrane systems since 1993, because a roof that just passes inspection isn't good enough.

Vancouvers Most Trusted Roofing & Waterproofing company

Need a roof that'll last?

We're so confident in our work, we'll guarantee it for 10 years. No questions asked.

Locally Owned EST.1999

Reliable work you can trust

100% Guaranteed

Masters of Industry-Standard Membranes

Why Builders Choose SG.

01

Zero Schedule Disruption

Vancouvers windows of opportunity are brief. We never hold up a job for a P.O. or paperwork. We work alongside you to move the job forward immediately.

02

Guaranteed Inspections

We use superior SBS base sheets and premium primer. Our jobs pass building envelope consultants inspections without hesitation.

03

Strict Cost Adherence

Even when projects hit major unexpected snags (like re-engineering an entire roof's drainage), we consistently find ways to keep costs below tender bids.

04

Zero Warranty Liability

100% of our installations since our 1993 inception are still performing perfectly. We build to outlast the building.

SolidGround | Horizontal Project Archive
Our Services

We Don't Cut Corners, We Seal Them.

Every installation we've done since 1993 is still performing exceptionally well today.

Commercial Hot Rubber

Executing massive commercial scopes with Bakor/Hydrotech systems engineered to last 33+ years without failure.

Plaza & Parkade

From Metrotown to the EA Sports soccer pitch, we seal high-traffic slabs so developers sleep soundly.

Wood-Frame Wrap

Zero turnaround time. We waterproof display suites and install counter flashing the same day. Siding crews start Day 1.

Rehab Assessment

Taking over 40-year-old disasters, re-engineering drainage with consultants, and delivering superior finishes under budget.

Burnaby Case Study

The 40 Year Sponge

The Situation

A complete tear-off project where brick pavers had to be stored and reinstalled. It seemed straightforward until we stripped the roof.

The Discovery

All 36 drains were installed higher than the roof deck. The insulation was waterlogged, sitting in 2" of standing water for over 40 years.

The Response

Working with engineers, we redesigned the drainage system entirely, establishing positive flow and upgrading to high-end porcelain tile.

The Result

Despite the redesign and material upgrades, we kept the final price below the next highest bid at the time of tender.

40
Years of Standing Water
36
Drains Re-engineered
#1
Value Performance
Reputation

The Industry Agrees.

"

"Solid Ground is the only contractor I don't have to micro-manage. They absorbed the primer cost on our last build just to ensure specs met their own standards. Exceptional."

MS

Mark S.

GC Project Manager
"

"When I write a spec, I hope it gets followed. Chris and Donald actually exceed it. Upgrading to 180g SBS felt to prevent off-gassing shows a deep understanding of building science."

JL

James L., P.Eng.

Envelope Consultant
"

"They're reasonable, punctual, and easy-going. They never hold up our sites waiting on a PO. They know Vancouver weather is a brief window, and they hustle alongside us."

RT

Robert T.

Condo Developer
Project Portfolio

Landmarks Protected by Solid Ground

Hover or select a project below to locate our engineering work on the map.

Crystal Mall & Podium, Burnaby
Metrotown Mall & Expansion
EA Sports Soccer Pitch
Vancouver Tech Hub
Delta Industrial Complex
Surrey Civic Plaza
Richmond Logistics Centre
Coquitlam Residential Towers
Abbotsford Institutional
Langley Commerce Park
Mission Gateway
Whistler Peak Lodge
New West Quay
Burnaby Commercial Hub
Whistler Peak Lodge
Vancouver Tech Hub
Crystal Mall
Metrotown Mall
Burnaby Hub
EA Sports Pitch
Coquitlam Towers
New West Quay
Richmond Logistics
Surrey Civic Plaza
Delta Industrial
Langley Park
Abbotsford Inst.
Mission Gateway

The Standard We Set.

When we started in 1993, the industry had a baseline. We decided that simply meeting the code wasn't enough to protect West Coast developments from long-term liability.

Industry Baseline Single-Ply Systems
Solid Ground standard 2-Ply Reinforced Systems
Industry Baseline 90lb Roofing Felt
Solid Ground standard 95-gram SBS Membrane
Industry Baseline Asphalt Primer
Solid Ground standard Bakor 930-18 / Hydrotech 6125

Questions we hear from GCs & Engineers.

What materials do you specify for hot rubber?

We exclusively use Henry Bakor 790-11 and Hydrotech 6125. We refuse to use cheap 15lb organic felt. We only install 180g SBS sanded base sheets to entirely prevent blistering and off-gassing issues down the line.

Are the principals actually on site?

Yes. Donald and Chris oversee the installations. You aren't dealing with a revolving door of junior project managers. You deal directly with the owners who have 33 years of reputation on the line.

How do you handle changed conditions?

After 30 years in Vancouver we plan for the changing conditions. When we find 40-year-old waterlogged insulation or drains set too high, we collaborate with engineers to redesign the system while aggressively maintaining budget integrity.

How fast can siding crews follow your wrap?

Immediately. There is zero turnaround time. We waterproof the display suite and install counter flashing the same day. Your siding crews are up and running Day 1.

What about insurance and liability?

Fully insured, WCB compliant, and backed by a 33-year track record where our original 1993 installations are still performing flawlessly. We remove the risk from the GC.

OgilvieAdvisory

In addition to our core waterproofing operations, our independent consulting services help developers grow. Expert contractor vetting, bidding price strategies and high-stakes infrastructure projects audits from the team that changed Vancouver's waterproofing standards.

Pre-Tender Review
Warranty Audit
Forensic Detection

Consultation and implementation services are billed independently.

Failure Rate

46.00%

EST 1993

"The industry doesn't need another generic consultant. It needs the hard truth from the guys who actually install the monolithic bond. That's what we bring to the table: 33 years of experience ensuring a zero-leak legacy for developers across Vancouver."

637004 Canada Inc dba Solid Ground.
Vancouver's most trusted waterproofing since 1993.

Website by Tradesmith.tech

© 2026. Solid Ground. All Rights Reserved.

Services

Address

Contact

637004 Canada Inc dba Solid Ground.
Vancouver's most trusted waterproofing craftsmen since 1993.

© 2026. Solid Ground. All Rights Reserved.

Website by Tradesmith.tech